Overview
Uretyco pricing is based on the work required to make the part correctly, not only the raw material. The quote engine evaluates geometry, process, material, quantity, setup, machining or build time, tooling, finishing, inspection, packaging, delivery, and supplier availability.
Main price drivers
| Driver | Examples | Effect |
|---|---|---|
| Geometry | Size, volume, pockets, holes, bends, supports, undercuts | Changes machine time, setup, tooling, and risk. |
| Material | Grade, stock form, availability, certification | Changes raw cost and supplier options. |
| Quantity | Prototype, batch, repeat order | Spreads setup cost and changes process economics. |
| Tolerances | Critical dimensions, GD&T, flatness, CMM | Adds production control and inspection. |
| Finish | Anodizing, powder coat, polishing, dyeing, masking | Adds operations and lead time. |
| Delivery | Urgent schedule, destination, packaging | Changes supplier matching and logistics cost. |
Instant quote logic
An instant quote is most reliable when the file is complete and the requirements are standard. If the model has unclear geometry, unusual material, strict tolerance, finish ambiguity, or regulated-use requirements, Uretyco may require manual review before the order is accepted for production.
Why price changes
- Changing quantity can change setup amortization, supplier fit, and material purchasing.
- Changing material can change machining time, print technology, stock availability, and finish compatibility.
- Adding a drawing with tight tolerances can add inspection and production control.
- Adding finish, masking, assembly, packaging, or certificates adds operations.
- Changing lead time can change which suppliers are available.
How to lower price
- Use standard materials and finishes when possible.
- Relax non-critical tolerances and only control the dimensions that affect function.
- Simplify features that require small tools, multiple setups, supports, special bends, or tooling complexity.
- Order a realistic quantity for the current development stage.
- Allow a more flexible lead time when schedule permits.
Uretyco AI workflow
- 1Analyze quote drivers
The assistant explains which requirements are likely increasing cost.
- 2Compare alternatives
Uretyco can compare lower-cost materials, processes, finishes, or tolerance strategies.
- 3Protect function
Critical requirements stay visible so cost reduction does not remove necessary quality controls.
FAQ
- Is the lowest quote always best? No. Supplier capability, lead time, quality scope, and risk matter.
- Can a quote change after manual review? Yes, if missing or ambiguous requirements change the production scope.
- Does Uretyco include shipping? Shipping and packaging depend on destination, size, urgency, and order terms shown at checkout.
Can't find what you need? Contact our team for expert assistance with your manufacturing project.
